Building a better world

Our aim is to help you meet your needs today,

without compromising our future tomorrow


 

 

Projects

 

 

 

 

 

Each opportunity is unique; there is no second chance

 

It's about maximising and making the very best effort, each and every time

 

"If you think it's expensive to hire a professional to do the job, wait until you hire an amateur" - Red Adair

 

#datacentres #electrical #projectmanagement #technology #bidding

#estimating #procurement #bigdata #builtenvironment #smartcities #facilities

#IoT #InternetofThings #AI #artificialintelligence #builtenvironment

#smartcities #smartcommunities #applicationsconnectivity #alwaysavailable

#autonomousvehicles #connectedcommunities #innovation #bigdata #wifi

#bitcoin #blockchain #cryptocurrency #FinTech #cloud #fibre #connectivity

#datacentres #colocation #hosting #resilience #robust #communications

#wayfinding #assetmanagement #rtls #rfid #tethering #integration

#renewables #solar #windgeneration #wavegeneration #photovoltaic

 

Providing The Connectivity That Enables Them All

 

 


 Sandfire Resources DeGrussa Solar Power Project

 

RESPONSIBLITIES

Construction supervision of the 10MW DeGrussa Solar Power Project, which is the largest integrated off-grid solar and battery storage facility in Australia DeGrussa Copper-Gold Mine, located 900km north-east of Perth in Western Australia, is one of the Asia-Pacific region’s premier, high-grade copper mines

 


info

 AOL

 

RESPONSIBLITIES

Country wide installation, build, testing, quality assurance, training and asset management

National local loop upgrade (LLU), Point of Presence (PoP) third party co-location installations for core and aggregate sites

 


info

 ABB

 

RESPONSIBLITIES

Fitting out works at One, Westferry Circus, Canary Wharf, London for Credite Suisse, all electrical and mechanical activities, plus ICT and communications infrastructure, project design co-ordination and implementation

 


info

 Nomura International

 

RESPONSIBLITIES

“Tardis Project” new build data centre Refurbishment of the disaster recovery site in London Docklands, IT suite, gaseous suppression, fire alarm and smoke aspiration replacement

 


info

 Woodside

Karratha LNG Plant

 

RESPONSIBLITIES

Electrical and Instrumentation (INLEC) resource estimating for DomGas

Planned preventative maintenance scopes and work package compilations, management, monitoring and reporting. Material and labour resourcing and procurement

 


info_outline ABOUT THE PROJECT 

 

The Karratha Gas Plant produces LNG, domestic gas, condensate and LPG; the facilities include five LNG processing trains, two domestic gas trains, six condensate stabilisation units, three LPG fractionation units as well as storage and loading facilities for LNG, LPG and condensate

 

 CITIC Pacific Mining 

Sino Iron Ore Project

 

RESPONSIBLITIES

Project managing both High Voltage (HV) and Low Voltage (LV) electrical, instrumentation, SCADA, controls ICT and communications installations, design coordination, managing installation teams, technical compliance and quality assurance

 


info_outline ABOUT THE PROJECT 

 

The Sino Iron Project has been developed at Cape Preston, one hundred kilometres south west of Karratha in Western Australia's Pilbara region. It is the largest magnetite mining and processing operation in Australia 

Works involved construction and commissioning of the third and fourth crushers, three production lines, dewatering plant, five MCCs and Sub Stations plus ICT integration and communications infrastructure, testing and commissioning

 

 Western Power

Boddington Gold Mine

HV Expansion Project

 

RESPONSIBLITIES

New 330 kV HV transmission line, substation and IT infrastructure, build, installation, deployment, testing and commissioning

 


info_outline ABOUT THE PROJECT 

 

Boddington Gold Mine HV Expansion Project serving the biggest gold mine project in Australia, the operation involves open cut mining from two large pits located 130km south east of Perth

 

 Rio Tinto

Hope Downs 4 Village  Koodaideri Exploration Camp

 

RESPONSIBLITIES

Project managing electrical and in-ground services comprising; HV, LV, civil engineering, fire alarms, building management systems, information technology and communications, client coordination, technical compliance, quality control, cost compilations and financial reviews, sub contract and supplier work packages, procurement, product evaluation and selection

Managing the contract team; internal vendors, construction, technical, document control, quality assurance, commercial management, risk review, logistics, health, safety and environmental. Managing subcontractor installation teams. Instrumentation, controls and SCADA interfacing, quality assurance and periodic inspection and testing, factory acceptance testing (FAT) and witness testing

Health, safety and environmental compliance, Job Hazard Analysis (JHA), Work Method Statement (WMS) reviews and workshops, Construction Risk Assessment Workshops (CRAW) chairing both internal and external meetings both on and off site

Testing and commissioning compliance, witnessing and sign off

 


info_outline ABOUT THE PROJECT 

 

Hope Downs 4 Permanent Village; this project links Rio’s existing rail, power and port infrastructure in the Pilbara and includes a permanent staff village for more than six hundred personnel

Koodaideri Iron Ore Exploration Camp; a one hundred and twenty-room exploration village plus supporting offices

 

 New Children’s Hospital

Perth

 

RESPONSIBLITIES

Project managing the installation of the dry fire alarm systems, EWIS, access control and security installations

 


info_outline ABOUT THE PROJECT 

 

New build specialist paediatric hospital and trauma centre for WA that will form part of a centre of excellence for health and research and host major paediatric education initiatives

 

 City of Subiaco Rokeby Road Streetscape Works

 

RESPONSIBLITIES

Project engineering the new street lighting with multi-use poles to accommodate additional signage and communications infrastructure, new facade feature lighting, median strip planter box feature uplighting and new Mains Switch Boards (MSB’s)

 


info

 Brookfield Multiplex

Fiona Stanley Hospital

 

RESPONSIBLITIES

Technology engineering, procurement, integration, strategic business plans and design reviews

Oversaw the specification writing and tender process of the web based facilities management portal for the management of the entire estate

Compiled subcontract work packages for external contractor’s tender submissions

 


info_outline ABOUT THE PROJECT 

 

Stage one managing contractor for the Fiona Stanley Hospital in Murdoch, WA

This 643 bed tertiary hospital will be Western Australia’s flagship health facility providing both high level medical and teaching facilities

 WA Health

 

RESPONSIBLITIES

Responsible for the research and compilation of governance standards concerning new buildings, facilities management, implementation and life cycle management throughout Western Australia

Project management of eHealth electronic health records, patient management and clinical information systems, network, server technology and their operating environments

Fiona Stanley Hospital engineering and technology integration plus compilation of governance standards, facilities management and implementation reviews

 


info

 Vodafone

 

RESPONSIBLITIES

Implementation of remote monitoring and battery discharge testing for all DC power plant and AC inverters within telecom and data centre environments

First, second and third level support, service level agreements (SLA’s) and writing user guides

 


info

 Kingston InMedia

 

RESPONSIBLITIES

Build of the premier "Centre K”, Media and Data Centre, plus adjoining offices serving the support staff

Chalfont and Bedford satellite site electrical upgrades

 


info

NTL

 

RESPONSIBLITIES

Installation of mobile communication sites, system design, planning permission, negotiation of wayleaves and consents, execution of all civil and mechanical engineering, lightning protection and electrical works

 


info

 Chevron

Gorgon Project

 

RESPONSIBLITIES

Project managing the installation of umbilicals, HV electrical supplies and fibre optic communications from subsea, underground across Barrow Island, to the LNG plant

Upstream Electrical Isolation Authority; responsible signatory for all upstream electrical works, design team coordination, technical compliance, cost compilations and financial reviews, subcontract and supplier work packages, procurement, product evaluation and selection

Managing subcontractor installation teams, instrumentation, controls and SCADA interfacing, health, safety and environmental compliance, quality assurance and periodic inspection and testing, factory acceptance testing (FAT) and witness testing, Hazardous Area Identification (HAZID), Hazardous Area Operation (HAZOP) Simultaneous Operations (SIMOPS), testing and commissioning compliance, witnessing and final sign off

Design and development of a unique Tracked Umbilical Machine (TUM) to lay umbilicals, cables, tubes and communications infrastructure over extremely challenging terrain within the confines of an Class “A” Nature Reserve

 


info_outline ABOUT THE PROJECT 

 

The Gorgon Upstream Joint Venture (GUJV), was an unincorporated joint venture between Technip Oceania and JP Kenny

The Gorgon Upstream Facilities Team (GUFT) provided Front End Engineering and Design (FEED), Engineering, Procurement and Construction Management (EPCM) services for all upstream facilities necessary to produce gas from the Gorgon Project via the subsea infrastructure and onshore pipelines back to the shore-based LNG plant on Barrow Island

Houses of Parliament

Palace of Westminster

 

RESPONSIBLITIES

Management of all data centre services, infrastructure, facilities and service providers, defining standards for server hardware, environmental conditions and cabling, monitoring and pro-active management of the entire estate infrastructure

Management of the data centre technical services group  

 


info_outline ABOUT THE PROJECT 

 

Parliamentary Information and Communications Technology (PICT) supports the communication technologies and provides a secure network environment for MPs, Lords and Parliament staff

Responsibilities includes service desk and engineering support, telecommunications, server and network management, applications development and support, program and project management and also more general HR, finance and support services

 

 Hampshire County Council

 

RESPONSIBLITIES

Responsible for all IT, mechanical and electrical works including new, planned, preventative and reactive works to the property portfolio within central Hampshire

 


info

 Pinacl Whitehall

 

RESPONSIBLITIES

Structured cabling installation of all the Ministry of Defence (MOD) Whitehall buildings in central London

Project consisted of the design and installation of both CAT 5e copper as well as blown fibre and supporting infrastructure

 


info

 The Jubilee Line Extension

 

RESPONSIBLITIES

The Jubilee Line Extension was the extension of the London Underground through south and east London Responsible for creating all electrical and communication activities, including all subcontract work packages plus project management and design co-ordination

 


info

 Rio Tinto

Nammuldi

Below Water Table Project

 

RESPONSIBLITIES

Project managing the HV and LV electrical, instrumentation, SCADA, controls and communications installations, design team coordination, managing installation teams, technical compliance and quality assurance  

 


info_outline ABOUT THE PROJECT 

 

Nammuldi Below Water Table (N - BWT), part of Rio Tinto’s Pilbara Expansion Strategy which is an Engineering, Procurement and Construction (EPC) project to design and construct a plant capable of crushing, wet screening and beneficiating twenty five million wet tonnes of iron ore per annum

The components include a remote primary crushing plant, three kilometres of overland conveyor and a wet iron ore processing plant

Rio Tinto

Rail Capacity Enhancement 283 Project

 

RESPONSIBLITIES

Project managing electrical and multi-disciplined in ground services comprising; HV, LV, civil engineering, potable water, fire water, sewerage, communications, rail signalling and compressed air

Design team coordination, technical compliance, quality control, cost compilations and financial reviews, subcontract and supplier work packages, procurement, product evaluation and selection, managing the contract team; internal vendors, construction, technical, document control, quality assurance, commercial management, risk review, logistics, health, safety and environmental   

Managing subcontractor installation teams, instrumentation, controls and SCADA interfacing, quality assurance and periodic inspection and testing, factory acceptance testing (FAT) and witness testing, health, safety and environmental compliance, Job Hazard Analysis (JHA), Work Method Statement (WMS) reviews and workshops, Construction Risk Assessment Workshops (CRAW) chairing both internal and external meetings - on and off site, testing and commissioning compliance, witnessing and sign off 

 


info_outline ABOUT THE PROJECT 

 

The Rail Capacity Enhancement (RCE) 283 Project was Rio Tinto Iron Ore Expansion Projects’ initial plan to expand its iron ore rail network capacity, the project comprised of the following: 

Permanent Way - Eight siding / junction upgrades, one major yard construction, ballast and other track materials supply, duplication of approximately 70 km of track, earthworks and drainage, signalling and communications

Infrastructure - two rail construction camps, temporary infrastructure and services to support construction, rolling stock maintenance facility upgrades, new facility construction to support

ECP / ATO implementation Systems - Electronic Controlled Pneumatic (ECP) braking system – roll out to entire wagon fleet of 7,500 ore cars, Automatic Train Operation (ATO) – across approximately 1,200 km of network, 180 locomotives and 7,500 ore cars

 

Rio Tinto

Brockman 4 Camp

 

RESPONSIBLITIES

New build of the camp site electrical and IT control rooms, HV facilities, SCADA, Instrumentation, BMS and control systems, full turnkey build, installation, quality control, testing, and commissioning  

 


info_outline ABOUT THE PROJECT 

 

Brockman 4 camp will allow Rio Tinto to expand the mine as well as develop its Western Turner Syncline project, with the aim of increasing the Pilbara production

This expansion would make it Rio Tinto's second-largest mine in the Pilbara

 



Why choose us? 

R M Pinder is a leading engineering specialist, bringing together electrical project management, technology, bidding, estimating and procurement expertise in one organisation 

 

This is all we do - so you get focus, efficiency and very considerable experience with proven results

 

Our passion, drive and commitment gives us a clear advantage

Our professional solutions... for all your needs